|
Concrete Block Machine
Three main sections the frame, the
mould box and stripper head and the vibrator unit.
Out put: 1000 – 1200 blocks in
8 Hours.
Prime Mover: Electric motor 2 H.P.
50 Cycle
400/440
Volt, 3 Phase, 1440 R.P.M.
Maintenance: The machine should be
kept lubricated at all points where grease
caps have been provided.
|